Both claims and all simulated evidence, roles, dates and values were newly written as fictional teaching content and represent no real client or project. The year 2030 is a scenario date, not a record of actual events. Neither claim is approved for external use. Proposed follow-up roles, review roles and planned dates represent no actual assignments or commitments.

[E01 simulated dispatch record](/journal/project-evidence-ledger/materials/en/asset-02.md) · [E02 simulated draft A](/journal/project-evidence-ledger/materials/en/asset-03.md) · [E03 simulated draft B](/journal/project-evidence-ledger/materials/en/asset-04.md)

## 2. C01 | Dispatch, delivery and acceptance

### Claim record

| Field | Fictional entry |
| --- | --- |
| Claim ID | C01 |
| Revision | r1 |
| Original statement awaiting verification | The 12 display stands in this batch have been delivered and accepted. |
| Subject, scope and basis | Simulated event display stands; 12 items; this delivery batch; as of 2030-03-05 |
| Nature of claim | Factual statement |
| Verification status | Partially supported |
| Link ID | L01 |
| Current qualified wording_for internal review | The simulated internal records for this batch state that 12 display stands were dispatched; receipt and acceptance remain to be verified. |
| Gaps and next steps | Obtain receipt confirmation, acceptance scope and records; not provided does not mean not performed. |
| Follow-up role | Proposed delivery-coordination follow-up; assignment pending |
| Review role | Proposed checking by user and review roles; assignment pending |
| Planned evidence-supplement date | 2030-03-08 |
| Actual verification date | 2030-03-05 |
| Triggers for renewed review | Receipt/acceptance records arrive, a dispatch record is corrected, or external wording is proposed to change. |

### Corresponding verification links

Link L01: C01 r1 ↔ E01 v1.

| Field | Fictional entry |
| --- | --- |
| Evidence location | OUT-07; first table entry |
| Scope supported | The internal record states that 12 items were dispatched. |
| Not yet supported or conflicting | No receipt or acceptance confirmation provided; dispatch does not establish completed delivery and acceptance. |
| Checking actions and results | Compared excerpt fields with claim scope and narrowed wording; no real external event was checked. |
| Checking role | Simulated reviewer |
| Verification date | 2030-03-05 |

### Actions and use approvals

| Field | Fictional entry |
| --- | --- |
| Record ID | A01 |
| Related claims and revisions | C01 r1 |
| Related evidence and versions | E01 v1 |
| Record type | Additional evidence |
| Gap or trigger | Dispatch does not confirm receipt or acceptance |
| Proposed evidence or basis for revision | Receipt and acceptance records identifying entity, batch, scope and date |
| Proposed provider and follow-up roles | Proposed delivery-coordination/document-provider role; assignment pending |
| Proposed review or confirmation role | Proposed user and review roles; assignment pending |
| Planned date | 2030-03-08 |
| Actual action date | (Leave blank; no action completed) |
| Old/new basis or wording and applicable scope | Not yet handled; only qualified internal wording retained |
| Affected materials and action records | Example not used externally; no actual withdrawal or correction |

| Use-approval fields | Fictional entry |
| --- | --- |
| Use record ID | U01 |
| Claim ID | C01 |
| Claim revision | r1 |
| Proposed wording and version | Pending wording: simulated internal records state that 12 items were dispatched; receipt and acceptance remain unverified. |
| Audience and channel | Unassigned |
| Use status | Not approved |
| Confirming role and approval basis | Unassigned; no approval basis available |
| Approval date | (Leave blank; not approved) |
| Validity period or conditions of use | (Leave blank; not approved) |
| Citation locations and update actions | Not used externally; register after audience, channel and scope are confirmed |

Retain the original statement, then check dispatch, receipt and acceptance separately. E01 records dispatch only; the other two steps cannot be presumed complete. At this stage, only qualified wording for internal review is formed.

## 3. C02 | Different bases with the same percentage

### Claim record

| Field | Fictional entry |
| --- | --- |
| Claim ID | C02 |
| Revision | r1 |
| Original statement awaiting verification | The materials-organizing subsidy has been set at 1200 exercise units. |
| Subject, scope and basis | Simulated event subsidy; materials organizing; 15%; the two drafts use different bases |
| Nature of claim | Calculation statement |
| Verification status | Conflicting |
| Link ID | L02、L03 |
| Current qualified wording_for internal review | Recalculation using the different bases in two simulated drafts gives 1200 and 300 exercise units respectively; adopted base, approval and eligibility conditions remain unconfirmed. |
| Gaps and next steps | Neither draft has approval/effectiveness evidence; an authorized role must confirm the basis, supersession and applicable scope. |
| Follow-up role | Proposed plan-coordination follow-up; assignment pending |
| Review role | Proposed checking by business, finance and authorized confirmation roles; assignment pending |
| Planned evidence-supplement date | 2030-03-09 |
| Actual verification date | 2030-03-05 |
| Triggers for renewed review | The basis is confirmed, formal approval is obtained, the scope changes, or a draft is revised. |

### Corresponding verification links

Link L02: C02 r1 ↔ E02 vA.

| Field | Fictional entry |
| --- | --- |
| Evidence location | A-1 and input table |
| Scope supported | With the given draft inputs, 8000×15%=1200. |
| Not yet supported or conflicting | Supports arithmetic with these inputs only; establishes no approval, payment or actual entitlement. |
| Checking actions and results | Recalculated E02 inputs; conflict with L03 retained. |
| Checking role | Simulated recalculation role |
| Verification date | 2030-03-05 |

Link L03: C02 r1 ↔ E03 vB.

| Field | Fictional entry |
| --- | --- |
| Evidence location | B-1 and input table |
| Scope supported | With the given draft inputs, 2000×15%=300. |
| Not yet supported or conflicting | Base differs from E02; no formal supersession or approval evidence, so the later draft cannot be selected unilaterally. |
| Checking actions and results | Recalculated E03 inputs; the basis requires separate authorized confirmation. |
| Checking role | Simulated recalculation role |
| Verification date | 2030-03-05 |

### Actions and use approvals

| Field | Fictional entry |
| --- | --- |
| Record ID | A02 |
| Related claims and revisions | C02 r1 |
| Related evidence and versions | E02 vA；E03 vB |
| Record type | Conflict pending confirmation |
| Gap or trigger | Different bases for the same subsidy; approval unclear |
| Proposed evidence or basis for revision | Authorized confirmation of the base, approval, effectiveness and supersession |
| Proposed provider and follow-up roles | Proposed plan-coordination role; assignment pending |
| Proposed review or confirmation role | Proposed business/finance and authorized confirmation roles; assignment pending |
| Planned date | 2030-03-09 |
| Actual action date | (Leave blank; no action completed) |
| Old/new basis or wording and applicable scope | Not yet handled; do not overwrite old drafts or determine the amount unilaterally |
| Affected materials and action records | Example not used externally; assess all citations after the basis is confirmed |

| Use-approval fields | Fictional entry |
| --- | --- |
| Use record ID | U02 |
| Claim ID | C02 |
| Claim revision | r1 |
| Proposed wording and version | Pending wording: the two simulated drafts recalculate to 1200 and 300; the adopted basis remains unconfirmed. |
| Audience and channel | Unassigned |
| Use status | Not approved |
| Confirming role and approval basis | Unassigned; no approval basis available |
| Approval date | (Leave blank; not approved) |
| Validity period or conditions of use | (Leave blank; not approved) |
| Citation locations and update actions | Not used externally; review wording again after the conflict is addressed |

Recalculation A: 8000 × 15% = 1200 exercise units. Recalculation B: 2000 × 15% = 300 exercise units. Both formulas can be correct, but the base and approval conditions remain unconfirmed. E03 does not automatically supersede E02 because it is dated later.

## 4. Complete simulated evidence index

| Evidence and version | Storage location | Exact location | Source and limitations |
| --- | --- | --- | --- |
| E01 v1 | [Simulated warehouse-dispatch record excerpt](/journal/project-evidence-ledger/materials/en/asset-02.md) | Record ID OUT-07; first record-table entry | One simulated internal source; no independent receipt or acceptance documents attached |
| E02 vA | [Simulated subsidy plan draft A](/journal/project-evidence-ledger/materials/en/asset-03.md) | Item A-1 and input table; approval-status note | Unconfirmed draft from the same scenario; basis conflicts with E03; not two independent approvals |
| E03 vB | [Simulated subsidy plan draft B](/journal/project-evidence-ledger/materials/en/asset-04.md) | Item B-1 and input table; supersession-status note | Another draft from the same scenario; a later date does not automatically supersede E02 |

## 5. CSV example downloads

These CSVs and the Excel examples use the same fictional dataset. Do not mix them into blank tables intended for real records.
- [Fictional claims ledger CSV](/journal/project-evidence-ledger/materials/en/asset-17.csv)
- [Fictional evidence index CSV](/journal/project-evidence-ledger/materials/en/asset-18.csv)
- [Fictional verification links CSV](/journal/project-evidence-ledger/materials/en/asset-19.csv)
- [Fictional actions and changes CSV](/journal/project-evidence-ledger/materials/en/asset-20.csv)
- [Fictional use approvals CSV](/journal/project-evidence-ledger/materials/en/asset-21.csv)

[Return to blank ledger and instructions](/journal/project-evidence-ledger/materials/en/asset-08.md)